ARCADÉ STUDIO
§ Turnkey Complete execution 10 stages

One team. One point of accountability.

Design through to handover under a single contract. Civil, electrical, plumbing, carpentry, painting, furniture and styling, sequenced and supervised by us.

A designer sketching a floor plan with material samples spread across the desk.
§ 01 The sequence Design to handover

When something goes wrong on site — and it will —

— there is exactly one number to call. That is the whole argument for turnkey. On a split contract, a delay in carpentry becomes a dispute between three parties and a fortnight of your evenings. On ours it becomes our problem.

We hold a weekly site meeting, issue a written record of every decision taken on site, and maintain a change log that shows what each variation costs before it is authorised.

A project architect reviewing drawings at a desk in a modern office.
Pl. 01Weekly site review — drawings against what is actually built.
§ 02 Project supervision What you receive
A designer checking floor plans at a desk surrounded by planting.

Everything in writing.

  • A priced bill of quantities before work begins
  • A programme, updated weekly once the site is live
  • Written minutes of every site meeting
  • A change log with the cost of each variation before it is authorised
  • Quality checkpoints at first fix, second fix and pre-handover
  • A joint snagging walk and rectification before completion
  • A handover file with every warranty, finish code and supplier contact
  • A six-month aftercare period